Polar Express Slides
5th Grade STEM Challenge
North Pole Railway
Forces, Motion & Engineering
Polar Express Engineers
Design, build, and test a model cargo train car using the Engineering Design Process.
Admit One: Junior Engineer All Aboard!
The Mission
Cargo for the North Pole
The Polar Express needs a brand-new cargo car to carry holiday supplies down Steep Glacier Pass.
Your team must engineer a train car that rolls smoothly, stays balanced, and travels as far as possible!
Golden Ticket Goal
- Roll straight down the ramp track
- Carry cargo safely without spilling
- Maximize distance using smart design
Slide 2 • The Challenge Hook
Forces on the Track
5th Grade Science Review
Gravity
Pulls the train down the ramp. A steeper ramp or heavier car increases the downward pull.
Friction
Rubbing between axles, wheels, and the track slows the train down. Smooth axles reduce friction!
Mass & Cargo
Adding cargo increases mass. More mass needs stronger axles and balanced weight distribution.
Unbalanced Forces
When gravity beats friction, the train accelerates! When friction takes over, the train stops.
Think: How can your design reduce unwanted friction?
Design Criteria & Constraints
Criteria (Must Do)
- • Fit cleanly on the classroom ramp track
- • Roll freely using spinning wheels and axles
- • Carry at least 10 pennies (cargo) without tipping
- • Travel at least 150 cm past the ramp
Constraints (Limits)
- • Use only materials from the Materials Depot
- • No pushing the train at the top of the ramp
- • Complete your blueprint before building
- • Finish build & 3 test trials in 25 minutes
Slide 4 • Criteria & Constraints
Materials Depot
Available Supplies
Cardstock / Cup
Train body & cargo bed frame
Plastic Straws
Axle sleeves (reduce friction)
Wooden Skewers
Axles that connect the wheels
Bottle Caps
4 wheels for smooth rolling
Masking Tape
Fastener for body and sleeves
Pennies / Washers
North Pole cargo load
Tip: Never tape the axle directly to the train body—let it spin inside the straw!
Step 1 & Step 2
1. Sketch Blueprint
Draw a labeled side view of your train car on your Train Blueprint Worksheet.
Label your wheels, axles, straw bearings, and where the cargo will sit.
2. Build Prototype
Keep your axles parallel so the train rolls straight instead of curving off the track.
Spin each wheel by hand to check for rubbing before your first ramp test!
Engineer Check: Are your wheels centered on the axles?
Step 3: Fair Testing
Run 3 Fair Trials
Release Gently
Line the front wheels up with the start line. Let go without pushing!
Measure Distance
Measure from the bottom of the ramp to the back of your train in centimeters.
Improve & Retest
Change ONE thing after Trial 1 (like axle alignment or cargo placement).
Record every trial on your Train Blueprint Worksheet!
Station Debrief
Share Your Findings
1. Which force helped your train move, and which force slowed it down?
2. How did adding cargo change your train's motion or stability?
3. What one redesign change made the biggest difference?
Complete your Golden Ticket Self-Check Great work, Engineers!
Conductor Lesson Plan
5th Grade STEM • Teacher Guide
Conductor Lesson Plan
Duration: 60 Minutes
Group Size: 2–3 Students
NGSS Alignment
- 5-PS2-1: Support an argument that gravitational force exerted by Earth on objects is directed down.
- 3-5-ETS1-1: Define a simple design problem with criteria and constraints.
- 3-5-ETS1-2: Generate and compare multiple solutions based on how well they meet criteria.
Learning Objectives
- • Explain how gravity, friction, and mass affect a rolling train car's motion.
- • Design and build a low-friction wheel-and-axle system using straws and skewers.
- • Collect fair-test distance data across 3 trials and iterate on one variable.
Materials & Track Setup
Per Student Team (2–3 students):
- • 1 sheet cardstock or 1 small paper cup (chassis)
- • 2 plastic drinking straws (axle sleeves/bearings)
- • 2 wooden skewers (axles, trimmed by teacher)
- • 4 plastic bottle caps (pre-punched center holes)
- • 1 arm's length of masking tape + 10–15 pennies
Class Test Track Station:
- • 1–2 long cardboard or wooden ramps (~1 m long, propped ~25 cm high on books)
- • Painter's tape start line at the top of the ramp
- • Meter sticks or measuring tape laid along the floor
- • Optional: side guardrails made from folded cardboard
Key Science Vocabulary
Gravity: Downward pull that accelerates the train down the ramp.
Friction: Force resisting motion when axles, wheels, or track rub.
Mass: Amount of matter in the train and cargo; affects momentum.
Axle & Bearing: Rod (skewer) spinning freely inside a sleeve (straw).
Polar Express Engineers • Conductor Lesson Plan Page 1 of 2
60-Minute Pacing & Facilitation
Step-by-Step Guide
| Phase |
Time |
Teacher & Student Actions |
| 1. Engage |
10 min |
Show Slides 1–3. Introduce the Polar Express cargo mission. Briefly review gravity, friction, and unbalanced forces on a ramp. |
| 2. Blueprint |
10 min |
Show Slides 4–6. Distribute Train Blueprint Worksheets. Students complete the warm-up and sketch a labeled train car before collecting supplies. |
| 3. Build |
15 min |
Teams build their prototype. Circulate to check that skewers spin freely inside straw bearings and wheels are not rubbing against the chassis. |
| 4. Test & Iterate |
15 min |
Show Slide 7. Teams run Trial 1 on the class ramp (no pushing!), measure distance in cm, adjust one variable, and complete Trials 2–3. |
| 5. Debrief |
10 min |
Show Slide 8. Facilitate whole-class discussion on forces and redesigns. Students complete the Golden Ticket Self-Check. |
Common Misconceptions & Troubleshooting
- Train won't roll: Students often tape the wooden skewer directly to the body. Remind them to tape the straw to the body and thread the skewer inside.
- Train curves off the track: Check if the two straw bearings are parallel or if one bottle cap is crooked on the axle.
- Cargo spills on impact: Encourage students to tape a small folded paper pocket or cup rim to hold pennies near the center of gravity.
Support (Scaffolding)
Provide pre-cut straw lengths and pre-punched bottle caps. Offer a sentence starter for the reflection: "My train slowed down because of friction between ___ and ___."
Extension (Challenge)
Challenge fast finishers to test how doubling the cargo (from 10 to 20 pennies) changes distance, and graph Trial 1 vs. Trial 3 results.
Polar Express Engineers • Conductor Lesson Plan Page 2 of 2
Train Blueprint Worksheet
North Pole Railway • Engineering Notebook
Train Blueprint Worksheet
Admit One
Name: ________________________
Date: ________________
Team #: ______
Part 1: Forces & Motion Warm-Up
1. Which force pulls the Polar Express train car down the ramp?
A. Friction
B. Gravity
C. Magnetism
D. Air resistance
2. Why do engineers put wooden axles inside plastic straws instead of taping them directly to the train body?
Part 2: Train Car Blueprint
Label: wheels, axles, straw bearings, and cargo area
How will you keep your cargo from spilling?
How will you make sure your axles stay straight?
Polar Express Engineers • Train Blueprint Worksheet Page 1 of 2
Part 3: Test Track Data
Release from the start line without pushing!
| Trial |
Cargo (Pennies) |
Distance (cm) |
Observations & Changes Made |
| Trial 1 |
|
|
|
| Trial 2 |
|
|
|
| Trial 3 |
|
|
|
Part 4: Engineering Reflection
1. What force slowed your train car down the most, and where did it happen?
2. Describe one change you made between Trial 1 and Trial 3. Did it improve your distance? Use your data to explain.
3. If you had 10 more minutes and one extra supply, what would you improve next?
Polar Express Engineers • Train Blueprint Worksheet Page 2 of 2
Golden Ticket Rubric
Polar Express Engineers • Assessment
Golden Ticket Rubric
Name: ______________________
Date: ____________ Team: ____
| Criteria |
4 • Express Conductor |
3 • Lead Engineer |
2 • Apprentice |
1 • In Training |
| Design & Build Quality |
Train rolls straight, axles spin freely in bearings, and cargo stays secure past 150 cm. |
Train rolls down the ramp and carries cargo, with minor wobbling or friction. |
Train rolls partway or tips; wheels or axles rub against the body. |
Train does not roll or fails to hold cargo during the test. |
| Forces & Motion Science |
Accurately explains how gravity, friction, and cargo mass affected motion using data. |
Correctly identifies gravity and friction in the design with basic explanation. |
Mentions forces but explanation is incomplete or unclear. |
Does not connect train performance to forces or motion. |
| Testing & Iteration |
Completes all 3 fair trials, records accurate cm data, and tests a clear improvement. |
Completes 3 trials and records data with at least one redesign attempt. |
Missing trial data or changes multiple variables without tracking. |
Data table is mostly blank or tests were not fair trials. |
| Teamwork & Constraints |
Follows all material/time limits and collaborates respectfully throughout. |
Follows constraints and shares building/testing tasks with teammates. |
Needed reminders on constraints, materials, or shared roles. |
Did not follow constraints or did not participate with team. |
Golden Ticket Self-Check
Total Score: ____ / 16
Did your train meet the 150 cm goal?
[ ] Yes [ ] Almost [ ] Not yet
Best Trial Distance (cm):
One thing our team engineered really well today:
Polar Express Engineers • Golden Ticket Rubric Page 1 of 1