Manager Mission Sub Plan
A teacher-facing guide and substitute plan for a 2-day independent project focused on management decision-making. It includes learning objectives, a daily schedule, and facilitation tips.
Decision Dilemma Project Guide
A student-facing guide for the "Decision Dilemma" project. It outlines the business crisis scenario, the mission requirements, and the specific slide content for their presentation.
Solution Sketcher Organizer
A two-page planning worksheet for students to use during Day 1 of their project. It guides them through the rational decision-making model steps and helps them map out their slide presentation content.
Project Pitch Rubric
A professional assessment rubric for the 2-day management project. It evaluates students on problem analysis, strategic thinking, recommendation logic, slide design, and professionalism.
Manager Mission Modified Sub Plan
A teacher-facing guide and substitute plan modified for 8th-grade students at a 4th-grade learning level. It includes simplified objectives, a daily schedule, and read-aloud tips.
Decision Dilemma Modified Guide
A simplified student-facing guide for "The Wet Shoe Disaster" project. It uses 4th-grade level reading to explain the crisis and the requirements for the 5-slide presentation.
Solution Sketcher Modified Organizer
A simplified planning organizer for students at a 4th-grade learning level. It provides specific solution choices, simple tables, and large writing areas to guide them through the project.
Project Pitch Modified Rubric
A simplified assessment rubric for the management project, designed for 4th-grade learning levels. It uses a star-based rating system and simple language to evaluate student work.